
OUR PROJECTS
Delivering Projects. Building Infrastructure. Creating Lasting Value.
At BIE-USHA (WA) LTD., our experience is demonstrated through our involvement in engineering, civil construction, oil and gas infrastructure, industrial installations and facility maintenance projects.
Over the years, we have participated in projects supporting critical infrastructure and operational facilities within Nigeria’s oil and gas industry.
Our project portfolio reflects our technical capabilities, commitment to quality workmanship and experience working with established industry operators and engineering contractors.
From civil engineering works and industrial facility improvements to specialised installations and infrastructure development, we approach every project with professionalism, responsibility and a focus on delivering value.
Our experience is built on practical execution, strong industry relationships and a commitment to engineering excellence.
⸻
FEATURED PROJECTS
- Project: Reactive and Proactive Maintenance of Buildings and Facilities at BOGT
Client: Renaissance Africa Energy Company (formerly SPDC)
Year: 2005 – Present (as stated in company profile) - Project: BOGT Civil Works
Client: SPDC / Renaissance Africa Energy Company
Year: December 2024 – Present (as stated in company profile) - Project: Installation of Produced Water In-Line Meter at BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2023 - Project: Installation of Concrete Overlay on BOGT Tank 10 Bund Wall
Client: Shell Petroleum Development Company (SPDC)
Year: 2023 - Project: Construction of Sports Pavilion
Client: Shell Petroleum Development Company (SPDC)
Year: 2022 – 2023 - Project: Bonny Non-Associated Gas (BNAG) Debottlenecking Project – Civil Scope
Client: Shell Petroleum Development Company (SPDC)
Year: 2018 - Project: Emergency Relief System at BOGT – Civil Scope
Client: Shell Petroleum Development Company (SPDC)
Year: 2017 - Project: Mechanical Facilities Intervention Works in Bonny Oil and Gas Terminal – Call-Off Contract
Client: Shell Petroleum Development Company (SPDC)
Year: 2014 - Project: Mothballing of Crude Oil Storage Tanks 6, 8, 10 and 14
Client: Shell Petroleum Development Company (SPDC)
Year: 2012 - Project: Bonny Terminal Mechanical Facilities Modification Works – Call-Off Contract
Client: Shell Petroleum Development Company (SPDC)
Year: 2011 - Project: Modification of Thermal Relief Lines at Valve Stations 1, 2, 3, 4 and Booster Station 4
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Installation of Gas Generators at NLNG GTS Nodes, Ubeta/Rumuji
Client: Nigeria LNG Limited (NLNG)
Year: 2010 - Project: Civil and Electrical Upgrade of Lamnalco Camp, BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Fabrication and Installation of Bund Wall Handrails at BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Bonny Terminal Mechanical Facilities Intervention Works
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Miscellaneous Civil Works at Bonny FLB Restaurant, BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Consortium Reactive and Preventive Routine Civil Maintenance of Buildings and Ancillary Facilities at Bonny FLB
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Repair of Failed 2-Inch Nozzle of Pressure Vessel at BNAG
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Procurement, Fabrication and Installation of 1-Inch Drain Line at Unit 11, NPA BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Pressure Testing of 18-Inch Line from Fuel Gas Line to Thermal Desorption Unit (TDU), BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Modification of NNPC Metering Skid at NPA, BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: BOGT Citadel Fence Installation Works
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Civil Upgrade of Bonny FLB (House 2), BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Bonny FLB Accommodation Painting Works, BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Civil Upgrade of Bonny FLB (House 1), BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2010 - Project: Training of Niger Delta Youths on Structural Welding and Fabrication (Skill Acquisition Programme)
Client: Niger Delta Development Commission (NDDC)
Year: 2010 - Project: Bonny Fuel Gas Plant Loop Line Construction – Civil Scope, Bonny Crude Oil Terminal
Client: Shell Petroleum Development Company (SPDC)
Year: 2009 - Project: Bonny Fuel Gas Plant Loop Line Construction – Mechanical Scope
Client: Shell Petroleum Development Company (SPDC)
Year: 2009 - Project: Emergency Relocation of Low Voltage Electrical Switch Room at BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2009 - Project: Provision of Electrical Maintenance Support Services at BOGT
Client: Shell Petroleum Development Company (SPDC)
Year: 2009 - Project: Rehabilitation of Incoming Manifold and Finima Saver Pit at Bonny Crude Oil Terminal
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2009 - Project: Bonny Terminal Mechanical Facilities Intervention Works
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2008 - Project: Bonny Oil and Gas Civil Infrastructure Call-Off Contract – Zone A
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2008 - Project: Training of Niger Delta Youths on Structural Welding and Fabrication (Skill Acquisition Programme)
Client: Niger Delta Development Commission (NDDC), Rivers Chapter
Year: 2008 - Project: Replacement and Installation of Jetty Fender at NLNG MOF Jetty, Bonny
Client: Nigeria LNG Limited (NLNG)
Year: 2007 - Project: Construction of Protective Fenders at NLNG ISB/OSB Jetty, Port Harcourt
Client: Nigeria LNG Limited (NLNG)
Year: 2007 - Project: Repair and Replacement of ExxonMobil BRT Loading Jetty Fender
Client: ExxonMobil
Year: 2007 - Project: Electrical Services – Call-Off Contract
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2007 - Project: Bonny Terminal Bund Wall Repair for Tank 15
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2007 - Project: Rehabilitation Works on Perimeter Fencing and Gate House
Client: Notore Chemical Industry
Year: 2007 - Project: Revamp and Painting of Export Metering Skid and Associated Header at BOGT
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2007 - Project: Painting of Export/Refinery Pumps and Associated Header
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2006 - Project: Statutory Maintenance (Shutdown) of Soku Gas Plant
Client: Shell Petroleum Development Company (SPDC)
Year: 2006 - Project: Mobilisation of Technical Manpower to NLNG Train 4
Client: CB&I Limited, NLNG Plant Site, Bonny
Year: 2005 - Project: Refurbishment of Emulsion Plant Switch House at SPDC, Bonny Terminal
Client: Negris Nigeria Limited
Year: 2005 - Project: Mechanical Maintenance and Painting of Crude Oil Storage Tanks and Facilities
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2005 - Project: Gas Vessels Statutory Maintenance – Plant Shutdown
Client: Eleme Petrochemical Company
Year: 2004 - Project: Crude Oil Tank 20 Blasting and Painting
Client: Shell Petroleum Development Company of Nigeria Limited, Bonny
Year: 2004 - Project: Crude Oil Tank 10 Washing and Cleaning
Client: Shell Petroleum Development Company of Nigeria Limited, Bonny
Year: 2004 - Project: Rehabilitation of Crude Oil Tanks 13 and 14 at SPDC, Bonny Terminal
Client: CB&I Nigeria Limited
Year: 2004 - Project: Painting of Facilities and Crude Oil Tanks Foam Riser Lines at Bonny Terminal
Client: Shell Petroleum Development Company of Nigeria Limited
Year: 2003